Hi
What are the Pro and Contra for each other mode?
So that i know right now is, on Parallel-Mode you need the Meeter.
If i got an 48V/3000VA and the requested Power is more then 2400W, what happend in the in-serial-Mode then?
What is happening in both mode if the Grid fails?
If i wanna use my Battery and PV-System with MPPT at first and if the Battery is on setted lowest SOC, so the PV-System should recharge the Batteries and the grid is now goes thru.
Bye
Timm