Hi all.
I am about to do the first charge on the battery bank and confused between the multiplus documentation and the batteries (SOPzS 2v 605Ah in 24V).
I understand I should use forced absorption mode. But the Multi manual, the absorption time can be up to 8h
But from the battery manual , for commissioning, I understand I need to set min 24h absorption time.
Have I gotten it all wrong?
Thanks!
Mike