I have an installation with 2 Quattro 5k 48V setup in a dual phase system. The system has been working well for some days. We were running some loads with a total power aprox 6000kVA, when the system shut down.
We have been trying to restart it but the masterQuattro (L1) will remain blinking the Inverter on bulb and the slave (L2) will turn flashing some of the leds and then will light only the overload led and shut down after.
The L2 Quattro goes to bulk and inverter and then goes to overload.
We attempted to start the system in charger only and it started well in. Bulk and mains on, but shut down after 30 seconds.
What can I do to restart the system?