Hi Community
My system has 3 x 10000VA Quattros , 1 Venus GX and Lead acid 2400 Ah 48V Back up system. And I have a separate grid tie SMA system 50kW which is charging loads and feeds non critical loads.
My back up system is not used 6 months now as there is not frequent grid outage and incase happens there is backup generator. So the backup works if there is no generator and grid.
I wanted to use my back up system during a night time and charge it during a day between 0800-1900 .
I just configured the scheduled charging option but the system was still charging even outside the time range. Please find my settings below and let’s share if there is someone experienced the same.