Hi Victron community. We have a 43 foot boat that we are rewiring. First step was to install 480kW woth or solar panels and a Victron 100/50 Smartsolar MPPT. We currently have twin banks of 2 x 200AH Lead Acid batteries (12V) and a single 120AH battery that is used as the cranking battery for the genset.
We like the look of the cerbo GX Touch 50 combo as the core of the management system, and the Centaur 12/60 (3) looks like a great charger option. We are having extra alternators added to the new Volvo Penta D6 engines to help increase our electric output.
We ideally want to make the genset redundent and so are looking at the Phoenix 12/1600 Smart Inverter. The main question we have is whether we need Smartshunts on one/two or all three battery banks to ensure we can see flow in/out of all banks and devices. I assume we would not need this if the Centaur was "smart" and it would be great if there was a SmartCentaur, but none of the other chargers seem to be able to handle 3 battery banks. Is this all sensible assumptions?