When the batteries are full, we still have pv power available but our grid operator doesen't allow feeding or we have an offgrid system, that power is lost. We could use that power and send it to a boiler or something similar.
I'm testing 2 types of relays that ca be externaly controlled in order to reduce or increase the power transfered. The relays are Anly ASR-40RA and Anly ASR-40CA. The first one, can be controlled by modifyng the resistance on the input contacts (0-250K), the second one can be controlled using curent (0-20mA).
Now the results:
- the first one is cutting the sinewave from the begining
- the second one, cutting the end
Now some real test on a Multi 800 with a 600W load can be found here:
https://www.dropbox.com/s/ome3jdthik2jf7o/2019-03-18%2013.28.25.mp4?dl=0
The behavior is similar on both relays, the inverter is poducing some noise, lowdest when the power is around 50%