Hi.
I have 4 ea of 140W solar panels, 2 in series and 2 parallel. I'm running a 12V battery system.
Unfortunately I purchased (before finding this sizing calculator) a 100/20 unit which works fine but can only take roughly 260W (13-14V x 20 A) so I'm loosin the other half of possible max input . I could put my two 220Ah batteries into 24V configuration and hence get the higher input from the system but my refrigerator and 230 V inverter are both 12V so changing them again would be costly.
So I have opted to upgrade the MPPT. But my logic (still learning) would be to go with the 100/50 model and not the 150/35 model. Would't I still be loosing from the 4 panels if I take the 150/35 version ?
Second question though is that as I have put the panels on V shape formation (first 2 set of panels are taking the morning sun, limited time around 12-14:00 both are fully lit, amd then the second set is taking the evening sun). All panels have double diodes. So in theory I'm only loosin for these couple of hours the maximum yield... so does it even make sense on upgrading anything ( Cost vs Benefit).
All help on this item would be appreciated