We set the EM24 meter to mode E (application E?), split phase 120/240V. ESS mode operates fine (i.e. the inverters feed power upstream without feeding power into the grid), but the meter loses its settings, but after a few seconds, it looks as if the Venus changes the settings of the EM24 to three phase and the system starts to behave erratically.