The last couple of days my 3 phase multiplus II 5kva system has been deciding around 11am to disconnect from the grid and run off of battery/solar until around 4pm.
I presume the system is upset about grid voltage or something, but I can't actually spot any place inside the Cerbo GX that may indicate what it considers to be the problem.
As far as I can tell, the grid voltage on all phases is less than the overvoltage 10 minute average value configured in ve.config for each multiplus.