My application envisages using the dump load on a 20 amp mppt to feed a resistive heating element designed to work at the maximum power point of the connected solar array. Does the load output pass the solar PV output directly through to the load terminals when energised or does it pass through the MPPT and so controlled before reaching the output terminals?
Many Thanks
Ross