question

marekp avatar image
marekp asked

Frequency shift without ESS

Hi,

I am currently testing having PV inverter on the AC-out side of my MP-II.

The ESS is not yet implemented because I do not know yet if ESS will work without Power Meter.

The worry I have is, what will happen when grid fails, my battery is full and PV is producing allot of energy that has nowhere to go.

Will there be frequency shift sent to the PV inverter to turn it down, or it is only done when the ESS assistant is loaded?

Regards,

Marek

ESSfrequency
2 |3000

Up to 8 attachments (including images) can be used with a maximum of 190.8 MiB each and 286.6 MiB total.

1 Answer
Matthias Lange - DE avatar image
Matthias Lange - DE answered ·

There is also a "PV Inverter assistant" that will do that.

1 comment
2 |3000

Up to 8 attachments (including images) can be used with a maximum of 190.8 MiB each and 286.6 MiB total.

marekp avatar image marekp commented ·

Hi @Matthias Lange - DE,

So as it is now, without assistants, it will not FQ shift?

Also, what happens if GX does not know of PV inverter, This "PV inverter assistant" will know what to do? Will it even load?

Regards,

Marek

0 Likes 0 ·

Related Resources

Additional resources still need to be added for this topic

What is ESS training video

ESS Quick Installation Guide

ESS design and installation manual