Victron ESS planned storage / grid injection peak shaving

Is there a way to configure the ESS with an MultiPlus-II GX such that the battery is charged mainly during peak PV power? In Germany there are funding programs where the grid delivery power is limited to 50% of the PV peak power and bound to a system charging the batteries during the midday - even if the battery could be already full during the morning.

This seems not only relevant for the funding but also helps to reduce the grid load, so it would be great to have it in the Victron ESS.