Hello experts! I ask for your help. I need to install the system for the following tasks: 1) GRID support during morning and evening load peaks. Power assist 2) Charge the batteries only in a certain window (at night). Supposed equipment: 1. Quattro 15000x3 2. Pylontech batteries (160 kWh) 3. CCGX and ET340. It was not possible to accurately determine the power of heavy-duty loads, and therefore I assume - you need to install the Quattro parallel to the grid, using only AC IN. Using the ET340 meter you can see the total consumption. Question: Will Power assist work with this configuration? And most importantly, will it be possible to use two functions - Power Assist and Battery Charge at a certain time on a schedule? I read on the forum that ESS and Power Assist do not work correctly together. The instructions say - When installing the ESS assistant, the Power Assist function in VE configure 3 is ignored. Is it so ? Thanks!