Hi everyone,
Is there a way or gridcode that we could use to adjust the reconnection time after loss of mains.
I understand gridcodes should only be used based on the certification, however similar to NL (as I understand from this post https://community.victronenergy.com/questions/34659/ess-not-possible-in-the-netherlands-at-least-not-w.html) there's no specific certification required for Victron, as there is no code to be certified. We are in a similar situation to NL where we need to adjust some settings, as long as the equipment has anti-ilanding equivalent certifications, we can be approved.
All the local tests have been done, and the only issue is the reconnection time that we need to adjust.
We are using an ESS with a Quattro and 250/100 Smart Solar MPPT.
Any help would be appreciated.