Hi, I plan a hybrid PV system with energy storage to support the loads during grid failures, but I need some help with the design. Planned PV power is 30 kWp with 2x Fronius Symo 15kW inverters.
1. What about Victron inverter-chargers, should I connect 3 x Quattro 10 000 to form a 3 phase system and split loads to phases ?
2. Could Quattro charge RES 2V batteries, is there a compatibility requirement ? Mine are 2V batteries  TRC ES iPzS 1750 Ah (24 pcs in total)
 TRC ES iPzS 1750 Ah (24 pcs in total)
3. Will GX device and BMV battery management be operational with batteries different from Victron ones ?
4. Zero export is required in my case, is that correct that I would not need a Fronius Smart meter for the zero feed-in, only Victron GX device ?