Hello everyone.
my question is about grid parallel.
can i add to the Grid source the power of the Inverter when the load is high and prioritize the Pv power first
Can the load go over the max and be bigger then the nom power or the courant of the MultiPlus so the inverter can be underrated compared to the maximum courant required by the load
I have a 3 phases system with high load (2 pumps. AC, heat system plus the house consumption ) and i want to install 3 MP3000/48 in parallel so i use PV and when the load is high it powered from the grid.
i heard about grid assist but i have no idea how to make it run..... how to do that in practice
Thank you