On a Multiplus-II with ESS when the LOM detection rejects the grid (for example because the Generator output is not stable enough), will this automatically disable charging from the grid as well?
I understand that LOM detection disconnects the transfer relais, so there is no direct connection between AC-OUT and the grid any more. But AC quality could still be good enough as an input for the battery charger (it rectifies and afterwards regulates the input anyhow).
I was not able to find any clear answer in the docs.
I'm in the planning phase for my ESS system, so unable to test it in real life.