question

ianddindustries avatar image
ianddindustries asked

AC2 time delay

Hi I’m looking for an assistant if available to shorten the time of which AC2 takes to connect on a mutliplus 3000 The system is used as a power assist only when plugged into shore power and all A/C loads are on AC 2

Thanks

Grant

ac out 2
2 |3000

Up to 8 attachments (including images) can be used with a maximum of 190.8 MiB each and 286.6 MiB total.

2 Answers
Matthias Lange - DE avatar image
Matthias Lange - DE answered ·

What you need is the "programmable relay" assistant. One to switch it on and another one to switch it off.

2 |3000

Up to 8 attachments (including images) can be used with a maximum of 190.8 MiB each and 286.6 MiB total.

ewalderasmus avatar image
ewalderasmus answered ·

Fortunately you are not in the situation I am in (with a Quattro and two inputs) meaning you can easily program an assistant to do what you want. As Matthias said you need to use a programmable relay.


Examples of what I have tried is shown in the following post:

https://community.victronenergy.com/questions/55931/quattro-assistant-setup.html?childToView=59383#answer-59383


2 |3000

Up to 8 attachments (including images) can be used with a maximum of 190.8 MiB each and 286.6 MiB total.

Related Resources

Additional resources still need to be added for this topic