Have 2 multiplus 2 units in parallel on single phase grid connected. Setup as ESS using ac coupled solar on ac input (1 phase of a split phase turbine). System discharges battery but does not use available power to charge the battery. Victron current sensor used and is now calibrated over 24hours. Using internal grid meter instead of external. Ccgx and both multiplus units running latest software.