i live in US, i have a DC coupled PV system (victron mppt) with 1 quattro setup as ESS thats feeding critical loads, my pv array charges battery in ~2hrs and then all the solar power is wasted, electric company allows feed in (need new meter) but they want balanced split phase 240 and not just feed in on one leg, what do i need to feed in a 240v split phase back to the main panel with 1x 120v quattro?
from my research seems like autotransformer can take 120 and make 240 but manual shows only scenarios downstream from inverter not upstream, will it work upstream as well or do i need something else?
thanks