Hi All,
I'm planning off-grid system with PV and wind turbine. Based on the initial research I think that MyPv Ac-Thor is able to work as a dump-load for the wind turbine. I would also like to include a hot water boiler as prime excess power load.
I found this page https://www.victronenergy.com/live/actor_offgrid but there is no information about how to configure AC PV Inverter.
If I "define Frequency start value 50.1Hz and the Frequency end value 51Hz" in Quattro and Ac-Thor my guess is that AC PC inverter should have some offset e.g. start 51Hz end 52Hz. If all three have the same range PV Inverter will lower it's output so there won't be excess power for Ac-Thor, am I right?
I would like to use dump load only for wind turbine after boiler reaches target temperature. I'm not sure if this can be achieved using only one Ac-Thor.
Two units with following configuration seems to make sens:
1. First Ac-Thor 50.1Hz - 51Hz -> hot water boiler
2. AC PV Inverter 51Hz - stop
3. Second Ac-Thor 51Hz - 52Hz -> dump load for the wind turbine
Am I missing some better solution?