Hi Blue power community.
I'm noticing a lot of inconsistencies across my installations in terms of "Overload Warnings". For example, a 5kVA Multiplus installation would register this warning sometimes at 3.8 kW, and sometimes at 7.2kW. I maintain a simple configuration of critical loads on AC1 (lights, tv), and heavy loads on AC2 (geyser). And all these warning occur other the same set of conditions, with Grid PV and battery available.
My question here is should overload warnings occur at when reaching nominal power (5kW for a 5kVA inverter), or at Peak power ( 10kW for a 5kVA inverter)?. And besides the datasheet, is there anywhere the parameters that drive this warning are set?
Thanks in advance.