I have situation where the client wants 2 Multiplus II inverters from the same solar and battery yet want to feed the AC to separate locations. Reason if one inverter overload other should continue supplying power.
If one GX can't control then you need 2 energy meters, 2 GX, 2 BMV. Basically 2 separate systems.
Are there another solution. Want to use 1 batterybank, 1 PV array and still know my SoC.