Hi,
Configuration: Cerbo GX (DVCC is on), Quattro 5000 (Firmware version 476) and MPPT 150/35.
Problem:
When the Quattro is connected to the grid and loading batteries, MPPT charging is (almost) blocked.
The only situation when the MPPT is allowed to charge is when the Quattro status is bulk.