Hi All. Hoping someone can assist with an explanation. The Victron ESS documentation says the following:
"When installing a single-phase ESS in a system with a three-phase connection to the utility grid, make sure you install the ESS on phase one, L1."
This is found on the following link:
https://www.victronenergy.com/media/pg/Energy_Storage_System/en/installation.html
Would someone be able to explain why it has to be on Phase 1 as opposed to Phases 2 or 3? Thanks.