I've search the forums and I have found similar question, but nothing specifically what I am trying to do.
I currently have a boat with 2x Quattro 5000/24/120V being supplied by a (very heavy) transformer which takes the Single Phase European 240v, stepping down to the required 120v for the Victrons.
I really want to convert the whole boat to native 240v. Most of the big ticket items I can rewire, but apparently my expensive quattros are stuck at 120v. I then had the idea to re-wire/re-program them to 120v split phase to give me the 240v and a dealer very helpfully sent me a diagram to confirm this was possible. However, the diagram shows the 240v input as split phase with the neutral returning to dockside as well as being linked in the Quattros.
My question is: Can I supply Quattros set up in split phase with a single phase and simply join the split phase neutrals at the quattros?
PS. Motivation for doing this is to get rid of the heavy transformer and use 240v appliances as I am based in Europe.