Hi. I'm living in Madagascar. I have a 5kVA Multiplus, a cerbo, 2*150/35 MPPTs, 2790 Wc PV array and I wait to be delivered lithium batteries.
There is "nothing" about feed-in here, so let's say that it is prohibited. No way to get the grid code standart and "password" required in ESS setting.
I read that "If you leave this setting as 'None', the system will not supply battery energy to support local AC loads when the grid is connected. You do need to change this setting even if it is your intention not to export DC energy to the grid." That's why my question : Can't I use ESS (any of the 3 modes) ? Is there any alternative for my need ?
I want to use the grid power only when power of PV is not sufficent to power load and SOC less than a specified value.
Thanks