Is it possible to have an ESS configuration, where grid is used as "power assist" if inverter loads go over a certain threshold?
Client wants a 3p Multiplus-II system, and 5kVA per phase is ok 99% of the time, there is a 3x16A grid line serving only as fallback. No feed-in and usually also no draw from grid (in said 99% of the cases).
As the client is reluctant to go for a 8kVA or 10kVA 3p Quattro configuration (mainly because the higher self-consumption of the devices), the question is if the grid could be used as "power assist" in those 1% peak cases.
I was thinking of an assistant activating the transfer switch if load went over xx%. Possible?