Hi all
I am looking at installing 2 x Victron LiFePO4 Lithium Battery 12.8V/200Ah-a - Smart in parallel.
My question is by installing these in parallel am I able to increase my continuous and maximum draw rates to allow for a 3000VA Multiplus inverter? I have read that batteries with internal BMS do not achieve an increase in draw rate when paralleled. I am considering running the VE.BUS BMS to manage the system.
I appreciate I will only have limited capacity at this draw level but will consider increasing the bank size at a later date and don't expect to use for long periods (<1 hour).
Any thoughts or experience would be greatly appreciated. Thank you