Hey everyone
I have a project coming up requiring on grid battery backup, the load is a 3 phase lift and I have read the documentation and watched the training videos and believe 3 x Victron Multiplus II 5000's will get the job done, I wanted to make sure I wasn't missing anything or there's any additional information I should know about Multi's and 3 phase backup.
Required:
They are per-phase (415v 3 phase supply.)
-5.5kw per phase
(8.51 amps per phase @ 0.9PF)
(Noting max grid[starting] current is9.82A per phase, which is ~6.4kW @ 0.9PF..)
I have specified
- 3 x Victron Multiplus !! 5000
- 2 x BYD B-Box Pro 13
- 2 x 6KW SMA Tri Powers
Thanks in advance!