Hello, I need to change the UTP cables of the VE.Bus of a 2x Multiplus Parallel System that is managed by a VenusGX.
I would like to avoid turning the system OFF. Is it safe to interrupt the VE.Bus communication for a shot period (some seconds) while I change the UTP cable? Specially between the Master and Slave, I have some doubts if the system keeps working stable. I need at least 30 seconds.