I have a 150/60 MPPT with 600W solar connected to my house bank, there are also 2x Phoenix Smart Chargers (50A 3+1) each have an output to the house bank and the engine battery, one has an output to the 12-24v charger for the bowthruster.
All are connected with VE.Direct and where possible Smart Networking.
I'd taken my batteries off shore power and isolated the MPPT to run the batteries down a bit to check their voltages. When I switched everything back on I noticed that the MPPT was in bulk and the 2x chargers were in absorption, the voltages were the same however the MPPT was putting a lot more Amps in. I'd have expected the house bank output on the chargers to be the same as the MPPT.
Should I change the set up so that one charger does the house bank and the other does the engine and bow thruster?