Good day everyone,
I have a setup similar to this: https://community.victronenergy.com/questions/31886/et340-multiplus-ii-gx-and-external-non-critical-lo.html except my single multiplus II 5kVA is setup on L2 instead of L1. There is an ET340 to monitor the phases as well as non critical loads beween the meter and AC in of inverter.
The system is setup in ESS with solar. Unfortnately it is exporting power out to the grid on instead of zeroing that phase. I have tried turning phase compensation on and off to no avail.
I have tried all the settings I can think of to try stop it. Is it because I am using L2 and not L1?