Generator as primary source/ diesel hybrid.

We are trying to offset diesel costs by running pv.

The generator will be running 24/7

Is it possible to run ess to have the genset supply predetermined load and have the pv supply the rest of load?

Ideally keeping enough load on the genset to prevent glazing up due to little to no load on the genset itself and the pv taking up the rest (sun permitting)