My marine system has enough ac output from one multiplus but i want more charge capacity so i would like to add a second multiplus as a charger only and have the charge bee coordinated between the two systems. Setting them both to the same charge curve is insufficient. There needs to be a master. What setting would i use in the ve bus configuration tool? It’s not a Parallel ac system but should i just set it to parallel, pick a master and a slave, and use the front panel button of the multiplus to set the slave to charge only mode? The general,reason i want to do this is since i don’t need the capacity of a second inverter i would rather not have the parasitic load of the inverter idling and the ac and dc wiring of a parallel ac system is much more precise and restrictive on the multiplus location.