Hi,
I have an island with 1,92 KWp, MPPT 150/35, Multiplus 2 48/3000, Venus GX and 3 Pylontech US2000.
In some cases, when the MP2 has to generate more then 2,5 KW, the MP2 is blinking red, which means overload.
Now i want to configure my system so, that it gets power from the grid only if MP2 has to generate more than 2 KW. But how ?
Thanks for your answers
Karli