Hi, I have two new 150/70-Tr Ve.Can MPPT charge controllers... They have Can bus and Ve direct ports, can I make one the master connected to a CCGX color control through the Ve Direct port, and then connect that one to the second MPPT through the can bus port...? I will be using Pylontech US3000 batteries... Or do I need to connect them both through their Ve Direct ports..? Thanks for any help....