Hi
I have an existing 3phase 10kW SMA GT inverter. We are installing 1 x Multiplus 5kVA48V per phase. and will connect the GT inverter to the output of the Multiplus II inverters as an AC Coupled system.
can someone please advise what settings to change on the SMA to allow me to have the system work in Cape Town South Africa, the site is already registered for Grid Feed-in.
do i need an energy meter on the GT prior to connecting to the Victron Multiplus II?
would the best VE-Config be to use be the Hub 2 even though its deprecated?
many thanks