Hi,
in order to integrate a new CHP machine/generator (2kw on the electrical side) i need a 3 phase on that side to charge BYD lvl batteries - for that i would like to deploy a small 3 phase 'sub-grid' just with the CHP generator connected on the AC side based on 3 x MultiPlus 48/800. On the 'consumer' side i thought about a single phase Quattro 48/10000 box. In addition a few MPPTs charging the batteries from the PV side. That raised the question if a a venus system (i.e. Cerbo) can manage all of that in a consistent way ?
best regards,