I have installed a system to go off grid for approx. 5 months (a long story). The system comprises a 6KVA generator, a Multiplus-II 48 l 5000 charger inverter and a 200 AH lead carbon battery pack. The initial problem was that the batteries did not charge. The local supplier then reprogrammed the charger/inverter and the batteries now charge at around 2.3 KW (44 amp 57 v). However, this charge rate does not vary - tests conducted with battery charges of 91%, 75% and 40%. The local supplier and his advisor cannot work out why the charge rate doesn't reach the specified 70 amp at low battery charges. Can anyone suggest what the problem might be? John Maltzahn john@inyakart.com.au