Newcomer here.
Here is what I have:
1. 30' trailer that is "pre-wired" for solar. 10ga wire running from roof connection to closet about 15 foot wire run. 8ga wire from closet to battery bay also about 15 foot wire run.
2. Running 2 Zamp 170 watt panels in parallel.
3. Have Victron BlueSmart MPPT 110/30 controller
4. Have Victron BMV-712 with temp sensor.
Question: Which is better:
A. Do I place the controller in the closet and connect to the 8ga to the battery side and the 10ga to the PV side? Use the VE Network to provide battery temp and voltage to the controller.
or
B. Do I splice together the 8ga and the 10 ga, and then place the controller in the battery bay and run short 6ga wire to the battery from the controller.
The issue I am trying to avoid is voltage drop from the panels if I place the controller in the battery bay.
Thanks,
Bill