How to better distribute production work among Multipluses?

Hello,

the work of the mutipluses (MP) is not evenly distribuded among my 3 units.

Load on the 3 phases in the house is minimum - around 100 W per phase. Battery is full, sun is shining and power is being sent to grid.

MP1 is reaching its limits, is overheating, frequently interrupting its production, while MP2 and MP3 are working much less.

can anyone help how to make all three MPs work at the same levels?

My configuration:

  • 3x victron multiplus II 3kW,
  • Grid set point = 10W.,
  • cerbo
  • 10 kWh pylontech batery
  • Energy Meter ET340
VE.Smart Network
2 |3000