Hi All
I have a 2 unit MP25K system back feeding the main house and also an Annex off the AC out critical loads. What are the best parameters to monitor in Advanced widgets to see how close I'm getting to need adding additional MP25K's into the system?
Ive had a few overload errors intermittently and want to ensure I'm not maxing out the 8K power limit. Do I just sum the AC output power widget with also the Acinput power?
Thanks in advance Jon