Designing a LiFe/grid/solar powered system with
1.BMS, Multi and CCGX connected via VE.BUS
2.MPPT via VE.Direct connected to CCGX
I have to be able to protect the LiFe battery by BMS switching off charging by MPPT. In documentation we have VE.Direct Remote on-off cable for that.
If I use that port I am unable to connect CCGX to MPPT.
Is it possible for CCGX to switch off MPPT by command from BMS but via VE.Bus connection between CCGX/Multi/BMS?