Good day.
At our office we have 3 phase system (Victron quattro 15x3) and we feed back to gird on for the big air-cons and CNC machines, but we don't want to feedback pass the meter outside, is it possible? we think our grid meter seeing the feedback as a possessive and not a negative, so we been changed for power we push back,.
like Sunsynk feedback up to CT clamp?
The meter we look at is Energy Meters VM EM24 Ethernet (Ethernet - for three-phase max. 65A).
Thank you