Tomorrow I have a plan to start a 3-phase MultiRS system. My problem is that I have a generator (for long-term outages) and this generator is 1 phase (yes I know I can buy 3-phase, but let me try to avoid it). I googled a lot and it looks like the following schema will work:
1. By charger Victron Skylla TG 48/50
2. Connect the charger to the bus
3. Correct 1 phase generator to charger
4. Run generator from Cerbo when SOC < 30%
5. Profit
Does this schema look correct? One question I have: it looks like these charges are dummies and cannot be controlled by Cerbo, is it ok to have such a system without actual charging control?