Ive used the mppt calculator, but with no results and my panels are not listed.
I have Trina TSM-415DE09R.08 panels, Voc 50.0v Isc 10.55A.
On my roof I can comfortably fit 5 panels and a single series string would make Voc 250v, @ Isc 10.55A, which I think a 250/70 mppt will work, or is it better to parallel all 5 panels making
Isc 52.75A @ Voc 50.0V and use a 150/70 mppt which is cheaper to buy too.
What would be the prefered configuration?