I have MPPT 150/85 with Inverter Quattro 8KVA and SuperCap batt of 7.1KVA. System not setup to put power back into “Grid”. ESS is enable and setup to only run on “Grid” when batt is depleted. During day the batt charges to 100% and at night the batt is drained until 5% is left resulting in switching to “Grid”. Next morning the PV’s kicks in charging the batt. Once SuperCap batt is on about 85% the Grid will be dropped and system switches to solar power. My question: I would like my system to switch off Grid when batt is charged up to 30%. Reason being is that I have sufficient PV power to both run the household and charge the batt at the same time. My installer informed me that due to the way a SuperCap batt operates it is not yet possible to modify switch over setting. Regards Danie