multiplus and grid problem

screenshot-2024-05-31-114357.pngscreenshot-2024-05-31-114258.pngscreenshot-2024-05-31-114320.pngscreenshot-2024-05-31-114344.pngscreenshot-2024-05-31-114049.pnghello guys i have a problem with my multiplus 2 when i have the grid on and i give a load the multiplus supply me the power from the batteries for 15 seconds and then it will supply from the grid how can i solve this problem i need directly the supply from the grid

Multiplus-IIbatterygrid
2 |3000

Up to 8 attachments (including images) can be used with a maximum of 190.8 MiB each and 286.6 MiB total.

3 Answers
nickdb avatar image
nickdb answered ·

Please document your installation, how it is wired etc. Configuration of the inverter, GX etc.

It is very difficult to help when you have no information.

1 comment
2 |3000

Up to 8 attachments (including images) can be used with a maximum of 190.8 MiB each and 286.6 MiB total.

tabet avatar image tabet commented ·
i attached pics
0 Likes 0 ·
Jason - UK avatar image
Jason - UK answered ·

@tabet what are you using to measure the grid load? The CT sensor on the Multiplus2, a external CT sensor or a grid meter like an ET112?

1 comment
2 |3000

Up to 8 attachments (including images) can be used with a maximum of 190.8 MiB each and 286.6 MiB total.

tabet avatar image tabet commented ·
nothing i dont have ct or et112
0 Likes 0 ·
Michelle Konzack avatar image
Michelle Konzack answered ·

It depends where you are located, because in some countries the GRID is not very stable and the Multiplus need time to sync with it.

1 comment
2 |3000

Up to 8 attachments (including images) can be used with a maximum of 190.8 MiB each and 286.6 MiB total.

tabet avatar image tabet commented ·
yes i have a 70kva generator its very stable