hello
The manual says to keep the SBP Load within 50 cm of the battery. Does that count for the SBP Charge as well? I mean, like in the drawing below, it's the BMS wich controls both SBPs. So why should distance matter in this situation?
If not, could I extend the thin black negative lead without consequences ?
thanks
n